What is the thrust construction method?

Connecting urban comfort with people! Demonstrating features in construction at difficult locations where excavation across tracks and other obstacles is challenging.

We would like to introduce the "Advancement Method" that we implement. There are two main types of underground pipe installation work: the open-cut method, which involves excavating the ground, laying prefabricated pipes at the bottom, and then backfilling, and the non-open-cut method, which allows for underground penetration without surface excavation. The advancement method we employ belongs to the non-open-cut category, which results in less surface excavation compared to the open-cut method. This leads to a reduction in the area occupied by construction, a decrease in construction-related nuisances such as noise, vibration, and dust, and minimizes the impact on traffic and community life. [Features] ■ Underground pipe installation work is divided into open-cut and non-open-cut methods. ■ The non-open-cut method involves less surface excavation compared to the open-cut method. ■ There is a reduction in the area occupied by construction, as well as in construction-related nuisances such as noise, vibration, and dust. ■ It excels in construction at locations where open-cutting is difficult, such as crossing tracks. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

FCR Promotion Method (Steel Pipe Type) [FCR Method Association]

Construction is only possible at the launch shaft.

The FCR construction method association uses the FCR thrust construction method for railway drainage facilities (such as buried drains, buried pipes, and buried gutters) that are severely damaged and cannot be repaired. The FCR thrust construction method has been improved from existing methods, fully considering the characteristics of buried drains, with the highest priority placed on safe construction. *For more details, please download the PDF or feel free to contact us.*

  • Company:FCR
  • Price:Other
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solving issues with construction methods! "Case Studies for Problem Solving Available"

The advancement construction method often faces many challenges during the excavation process. Here are examples of how those problems were solved!

Have you ever faced any of these issues when performing construction using thrusting methods? ▶ Construction was halted due to encountering obstacles like wooden stakes or H-beams... ▶ The time and cost of construction increased, leading to delays or interruptions... ▶ Construction over difficult distances could not be managed with standard equipment and methods... The "Milling Mole Method" solves these problems associated with thrusting methods! 【Example of a resolved case】 ✔ Sewer construction in Osaka City Planned to push 127 meters in one span using a standard mud slurry method with a diameter of φ80mm. Immediately after starting, the machine encountered wooden stakes, making it impossible to proceed, and the excavation was halted. By changing the plan to adopt the Milling Mole Method, the presence of obstacles was confirmed by discharging wood chips, and the thrusting was completed. ✔ Sewer construction in Osaka Prefecture Planned to push 119 meters in one span using a standard mud slurry method with a diameter of φ1800mm. While excavating about 10 meters, the machine encountered support piles of a bridge pier, making it impossible to proceed, and both the excavation machine and thrusting pipe were left underground. By changing the plan to adopt the Milling Mole Method, re-excavation was carried out from the same launch shaft. The reinforced concrete pipe that became an obstacle was cut, and the discharge of metal fragments, thrusting pipe collars, and rebar was confirmed, allowing safe passage through the obstacle section, and the thrusting was completed. *We are currently providing materials such as "Case Studies of Problem Solving" and "Comparison of Methods for Dealing with Obstacles in Thrusting Methods" from the PDF!

  • Special Construction Method
  • Sewerage facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Advancement Construction Method"

We will respond with various methods suitable for different situations and ground conditions with a diverse range of variations.

Our company conducts various "advancement methods," including the Cobra method and pipe return method. In particular, regarding advancement construction, we have made various efforts and continuous pursuits, accumulating a track record of achievements. Please feel free to contact us if you have any requests. 【Lineup】 ■ Cobra Method ■ Pipe Return ■ Uncle Mall ■ Envi Liner *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration